🌍 SAP · subject

SAP SAP PP Syllabus

Every chapter and topic of SAP PP examined in SAP — 7 chapters, 24 topics and 72 sub-topics, plus 65 flashcards written against it.

7Chapters
24Topics
72Sub-topics
~30hEst. first pass
12%Of SAP
65Flashcards

SAP PP syllabus — full chapter and topic list

Expand any chapter to see its topics and sub-topics. This is the whole examinable outline for SAP PP in SAP, not a summary of it.

  1. Introduction to SAP PP

    2 topics
    • Overview of SAP PP
      • Definition and Importance
      • Integration with Other SAP Modules
      • SAP PP Architecture
    • SAP Navigation
      • SAP GUI Overview
      • Navigating Through SAP PP
      • User Roles and Authorizations
  2. Master Data in SAP PP

    5 topics
    • Material Master
      • Material Types
      • Material Master Views
      • Material Master Data Maintenance
    • Bill of Materials (BOM)
      • BOM Structure
      • Creating and Managing BOMs
      • BOM Usage in Production
    • Work Centers
      • Work Center Categories
      • Creating and Managing Work Centers
      • Capacity Planning
    • Routings
      • Routing Structure
      • Creating and Managing Routings
      • Routing Integration with BOM and Work Centers
    • Production Versions
      • Definition and Usage
      • Creating Production Versions
      • Production Version Management
  3. Production Planning

    3 topics
    • Demand Management
      • Planned Independent Requirements (PIR)
      • Sales and Operations Planning (S&OP)
      • Forecasting
    • Material Requirements Planning (MRP)
      • MRP Types
      • MRP Run (Planning Run)
      • MRP Results Analysis
    • Long-Term Planning (LTP)
      • LTP Overview
      • LTP Scenarios
      • LTP Execution and Analysis
  4. Production Execution

    4 topics
    • Planned Orders
      • Creating Planned Orders
      • Converting Planned Orders to Production Orders
      • Planned Order Management
    • Production Orders
      • Creating Production Orders
      • Order Confirmation
      • Goods Movement
    • Process Orders
      • Process Order Types
      • Creating and Managing Process Orders
      • Process Order Execution
    • Repetitive Manufacturing
      • Repetitive Manufacturing Overview
      • Production Versions in Repetitive Manufacturing
      • Backflushing
  5. Advanced Planning and Optimization (APO)

    3 topics
    • Introduction to APO
      • APO Overview
      • APO vs. Traditional Planning
      • APO Modules
    • Detailed Scheduling
      • Scheduling Strategies
      • Resource Planning
      • Finite Scheduling
    • Production Planning/Detailed Scheduling (PP/DS)
      • PP/DS Overview
      • PP/DS Heuristics
      • PP/DS Optimization
  6. Reporting and Analytics in SAP PP

    3 topics
    • Standard Reports
      • Production Order Reports
      • Material Requirement Reports
      • Capacity Reports
    • Custom Reports
      • Creating Custom Reports
      • Using SAP Query
      • Using ABAP for Custom Reports
    • Key Performance Indicators (KPIs)
      • Defining KPIs
      • Monitoring Production Performance
      • Continuous Improvement
  7. Integration with Other Modules

    4 topics
    • SAP MM Integration
      • Material Management Overview
      • Procurement Process Integration
      • Inventory Management Integration
    • SAP SD Integration
      • Sales and Distribution Overview
      • Sales Order Processing
      • Delivery and Billing Integration
    • SAP QM Integration
      • Quality Management Overview
      • Quality Inspection Lot Processing
      • Quality Notification and Control
    • SAP PM Integration
      • Plant Maintenance Overview
      • Maintenance Order Management
      • Preventive Maintenance Integration

SAP PP flashcards for SAP

20 of 65 cards from the SAP PP deck — real questions with worked answers.

  1. What is the primary purpose of the SAP PP (Production Planning) module?

    SAP PP manages and controls the manufacturing process — it handles planning of production (demand, MRP, capacity) and execution (production/process orders), integrating with MM, SD, QM, and FICO to ensure materials are produced in the right quantity, at the right time, and at the right cost.

  2. In SAP PP, what are the two broad phases of the production cycle?

    Planning (Demand Management, MRP, capacity planning, planned orders) and Execution/Shop-floor control (converting planned orders to production/process orders, confirmations, goods movements, and settlement).

  3. What SAP transaction code opens the standard SAP Easy Access menu (the initial navigation screen)?

    SESSION_MANAGER — but users typically reach it automatically at logon; the Easy Access menu is the default entry screen from which transaction codes and menu paths are launched.

  4. In SAP navigation, what is the difference between the /n and /o prefixes entered in the command field?

    /n ends the current transaction and starts a new one in the same session/window; /o opens the transaction in a new session (window) while keeping the current one open. /nex ends the session without a confirmation prompt.

  5. What is the SAP Material Master and why is it central to PP?

    The Material Master (MM01/MM02/MM03) is the central repository of all data about a material, organized into views (Basic Data, MRP 1-4, Work Scheduling, Accounting, etc.). PP relies especially on the MRP and Work Scheduling views for planning and production.

  6. Which Material Master views are most important for the PP module?

    MRP 1, MRP 2, MRP 3, MRP 4 (planning, procurement, forecasting/strategy, BOM/production versions) and the Work Scheduling view (used for in-house production/order data).

  7. What is a Bill of Materials (BOM) in SAP PP?

    A BOM is a complete, structured list of the components (with quantities and units) required to produce a finished or semi-finished product. It is created with CS01, changed with CS02, displayed with CS03.

  8. Name the main BOM categories in SAP.

    Material BOM, Equipment BOM, Functional Location BOM, Document BOM, and Sales Order BOM. In PP the Material BOM is the most commonly used.

  9. What is the difference between a single-level and a multi-level BOM?

    A single-level BOM lists only the immediate components of one assembly. A multi-level BOM explodes each assembly down through all sub-assemblies to raw materials, showing the full product structure hierarchy.

  10. What is a BOM usage in SAP, and give an example?

    BOM usage defines the area/purpose for which the BOM is valid (controls which item statuses are allowed). Example: Usage 1 = Production, Usage 2 = Engineering/Design, Usage 3 = Universal, Usage 5 = Sales.

  11. What is a Work Center in SAP PP?

    A Work Center (CR01/CR02/CR03) is the place/resource (machine, person, line) where operations are performed. It provides data for scheduling, capacity planning, and costing, and is linked to a cost center and standard value key.

  12. What key categories of data does a Work Center supply to the production process?

    Scheduling data (formulas for setup/machine/labor times), Capacity data (available capacity, utilization, shifts), and Costing data (cost center + activity types for valuing operations).

  13. What is a Routing in SAP PP?

    A Routing (CA01/CA02/CA03) describes the sequence of operations needed to manufacture a material, specifying for each operation the work center, standard times, and component allocation. It drives lead-time scheduling and costing.

  14. What is the relationship between a Routing, its operations, and Work Centers?

    A Routing contains an ordered sequence of operations; each operation is assigned to a Work Center that provides the times and cost data. Components from the BOM are allocated to specific operations for staging.

  15. What is a Production Version in SAP PP and what does it link?

    A Production Version (maintained in MRP 4 / C223) defines a valid combination of a BOM alternative and a Routing/Rate Routing used to produce a material for a given validity period and lot-size range. It is mandatory for repetitive manufacturing and for many APO/PP-DS scenarios.

  16. Why can a material have more than one Production Version?

    Different production versions represent alternative ways to make the same material (different BOM alternatives, routings, lines, or lot-size ranges), letting the system select the appropriate method based on quantity, date, or line availability.

  17. What is Demand Management in SAP PP?

    Demand Management (MD61/MD62/MD63) determines the requirement quantities and dates for finished products and important assemblies, creating the Planned Independent Requirements (PIR) that drive MRP. It bridges forecast/sales planning and MRP.

  18. What is a Planned Independent Requirement (PIR)?

    A PIR is a planned quantity of a finished product needed in a future period, entered in Demand Management (MD61). It represents anticipated demand (forecast) independent of actual sales orders and is consumed by incoming customer orders depending on the planning strategy.

  19. What is the role of the Planning Strategy in Demand Management?

    The planning strategy (e.g., 10 Make-to-Stock, 20 Make-to-Order, 40 Planning with Final Assembly) controls how PIRs and sales orders interact, whether production is triggered by forecast or by orders, and how requirements are consumed.

  20. Compare Make-to-Stock (MTS) and Make-to-Order (MTO) production.

    MTS produces finished goods to anonymous stock based on forecast/PIRs before orders arrive (strategies 10/40). MTO produces specifically against individual sales orders, with stock kept as sales-order stock and no anonymous warehouse buildup (strategy 20/50).

See more SAP PP flashcards →

Planning SAP PP for SAP

SAP PP is about 12% of the SAP syllabus by topic count — 24 of 202 topics, spread over 7 chapters. At roughly 45 minutes per topic plus 12 minutes per sub-topic, a first pass runs to about 30 hours.

The heaviest chapters are Master Data in SAP PP (5 topics), Production Execution (4 topics), Integration with Other Modules (4 topics) . Front-load those while your energy is high; the short chapters are better revision filler later.

Work top-down: read the chapter, then tick topics off individually rather than marking the whole chapter done. Sub-topics are where silent gaps hide.

SAP PP (SAP) FAQ

What is in the SAP SAP PP syllabus?

SAP PP is split into 7 chapters — Introduction to SAP PP, Master Data in SAP PP, Production Planning, Production Execution, Advanced Planning and Optimization (APO) and Reporting and Analytics in SAP PP, and 1 more, containing 24 topics and 72 sub-topics in total.

How is SAP PP structured in the SAP syllabus?

7 chapters. SAP PP accounts for about 12% of the topics in the whole SAP syllabus (24 of 202).

How long should I spend on SAP PP for SAP?

Budget around 30 hours for a first pass through SAP PP — about 45 minutes per topic plus 12 minutes per sub-topic across its 24 topics. Add revision cycles on top.

Are there flashcards for SAP SAP PP?

Yes — a 65-card SAP PP deck. Sample cards are printed on this page, and the full deck is free in the Examius app with spaced repetition scheduling.