๐ŸŒ SAP ยท subject

SAP SAP PP Syllabus

The SAP PP syllabus for SAP in full: 7 chapters, 24 topics and 72 sub-topics, every one listed below, plus 65 SAP PP flashcards with answers.

7Chapters
24Topics
72Sub-topics
65Flashcards

SAP PP syllabus: all 7 chapters

Expand any chapter to see its topics and sub-topics.

  1. Introduction to SAP PP

    2 topics
    • Overview of SAP PP
      • Definition and Importance
      • Integration with Other SAP Modules
      • SAP PP Architecture
    • SAP Navigation
      • SAP GUI Overview
      • Navigating Through SAP PP
      • User Roles and Authorizations
  2. Master Data in SAP PP

    5 topics
    • Material Master
      • Material Types
      • Material Master Views
      • Material Master Data Maintenance
    • Bill of Materials (BOM)
      • BOM Structure
      • Creating and Managing BOMs
      • BOM Usage in Production
    • Work Centers
      • Work Center Categories
      • Creating and Managing Work Centers
      • Capacity Planning
    • Routings
      • Routing Structure
      • Creating and Managing Routings
      • Routing Integration with BOM and Work Centers
    • Production Versions
      • Definition and Usage
      • Creating Production Versions
      • Production Version Management
  3. Production Planning

    3 topics
    • Demand Management
      • Planned Independent Requirements (PIR)
      • Sales and Operations Planning (S&OP)
      • Forecasting
    • Material Requirements Planning (MRP)
      • MRP Types
      • MRP Run (Planning Run)
      • MRP Results Analysis
    • Long-Term Planning (LTP)
      • LTP Overview
      • LTP Scenarios
      • LTP Execution and Analysis
  4. Production Execution

    4 topics
    • Planned Orders
      • Creating Planned Orders
      • Converting Planned Orders to Production Orders
      • Planned Order Management
    • Production Orders
      • Creating Production Orders
      • Order Confirmation
      • Goods Movement
    • Process Orders
      • Process Order Types
      • Creating and Managing Process Orders
      • Process Order Execution
    • Repetitive Manufacturing
      • Repetitive Manufacturing Overview
      • Production Versions in Repetitive Manufacturing
      • Backflushing
  5. Advanced Planning and Optimization (APO)

    3 topics
    • Introduction to APO
      • APO Overview
      • APO vs. Traditional Planning
      • APO Modules
    • Detailed Scheduling
      • Scheduling Strategies
      • Resource Planning
      • Finite Scheduling
    • Production Planning/Detailed Scheduling (PP/DS)
      • PP/DS Overview
      • PP/DS Heuristics
      • PP/DS Optimization
  6. Reporting and Analytics in SAP PP

    3 topics
    • Standard Reports
      • Production Order Reports
      • Material Requirement Reports
      • Capacity Reports
    • Custom Reports
      • Creating Custom Reports
      • Using SAP Query
      • Using ABAP for Custom Reports
    • Key Performance Indicators (KPIs)
      • Defining KPIs
      • Monitoring Production Performance
      • Continuous Improvement
  7. Integration with Other Modules

    4 topics
    • SAP MM Integration
      • Material Management Overview
      • Procurement Process Integration
      • Inventory Management Integration
    • SAP SD Integration
      • Sales and Distribution Overview
      • Sales Order Processing
      • Delivery and Billing Integration
    • SAP QM Integration
      • Quality Management Overview
      • Quality Inspection Lot Processing
      • Quality Notification and Control
    • SAP PM Integration
      • Plant Maintenance Overview
      • Maintenance Order Management
      • Preventive Maintenance Integration

SAP SAP PP flashcards โ€” 65 questions with answers

  1. What is the primary purpose of the SAP PP (Production Planning) module?

    SAP PP manages and controls the manufacturing process โ€” it handles planning of production (demand, MRP, capacity) and execution (production/process orders), integrating with MM, SD, QM, and FICO to ensure materials are produced in the right quantity, at the right time, and at the right cost.

  2. In SAP PP, what are the two broad phases of the production cycle?

    Planning (Demand Management, MRP, capacity planning, planned orders) and Execution/Shop-floor control (converting planned orders to production/process orders, confirmations, goods movements, and settlement).

  3. What SAP transaction code opens the standard SAP Easy Access menu (the initial navigation screen)?

    SESSION_MANAGER โ€” but users typically reach it automatically at logon; the Easy Access menu is the default entry screen from which transaction codes and menu paths are launched.

  4. In SAP navigation, what is the difference between the /n and /o prefixes entered in the command field?

    /n ends the current transaction and starts a new one in the same session/window; /o opens the transaction in a new session (window) while keeping the current one open. /nex ends the session without a confirmation prompt.

  5. What is the SAP Material Master and why is it central to PP?

    The Material Master (MM01/MM02/MM03) is the central repository of all data about a material, organized into views (Basic Data, MRP 1-4, Work Scheduling, Accounting, etc.). PP relies especially on the MRP and Work Scheduling views for planning and production.

  6. Which Material Master views are most important for the PP module?

    MRP 1, MRP 2, MRP 3, MRP 4 (planning, procurement, forecasting/strategy, BOM/production versions) and the Work Scheduling view (used for in-house production/order data).

  7. What is a Bill of Materials (BOM) in SAP PP?

    A BOM is a complete, structured list of the components (with quantities and units) required to produce a finished or semi-finished product. It is created with CS01, changed with CS02, displayed with CS03.

  8. Name the main BOM categories in SAP.

    Material BOM, Equipment BOM, Functional Location BOM, Document BOM, and Sales Order BOM. In PP the Material BOM is the most commonly used.

  9. What is the difference between a single-level and a multi-level BOM?

    A single-level BOM lists only the immediate components of one assembly. A multi-level BOM explodes each assembly down through all sub-assemblies to raw materials, showing the full product structure hierarchy.

  10. What is a BOM usage in SAP, and give an example?

    BOM usage defines the area/purpose for which the BOM is valid (controls which item statuses are allowed). Example: Usage 1 = Production, Usage 2 = Engineering/Design, Usage 3 = Universal, Usage 5 = Sales.

  11. What is a Work Center in SAP PP?

    A Work Center (CR01/CR02/CR03) is the place/resource (machine, person, line) where operations are performed. It provides data for scheduling, capacity planning, and costing, and is linked to a cost center and standard value key.

  12. What key categories of data does a Work Center supply to the production process?

    Scheduling data (formulas for setup/machine/labor times), Capacity data (available capacity, utilization, shifts), and Costing data (cost center + activity types for valuing operations).

  13. What is a Routing in SAP PP?

    A Routing (CA01/CA02/CA03) describes the sequence of operations needed to manufacture a material, specifying for each operation the work center, standard times, and component allocation. It drives lead-time scheduling and costing.

  14. What is the relationship between a Routing, its operations, and Work Centers?

    A Routing contains an ordered sequence of operations; each operation is assigned to a Work Center that provides the times and cost data. Components from the BOM are allocated to specific operations for staging.

  15. What is a Production Version in SAP PP and what does it link?

    A Production Version (maintained in MRP 4 / C223) defines a valid combination of a BOM alternative and a Routing/Rate Routing used to produce a material for a given validity period and lot-size range. It is mandatory for repetitive manufacturing and for many APO/PP-DS scenarios.

  16. Why can a material have more than one Production Version?

    Different production versions represent alternative ways to make the same material (different BOM alternatives, routings, lines, or lot-size ranges), letting the system select the appropriate method based on quantity, date, or line availability.

  17. What is Demand Management in SAP PP?

    Demand Management (MD61/MD62/MD63) determines the requirement quantities and dates for finished products and important assemblies, creating the Planned Independent Requirements (PIR) that drive MRP. It bridges forecast/sales planning and MRP.

  18. What is a Planned Independent Requirement (PIR)?

    A PIR is a planned quantity of a finished product needed in a future period, entered in Demand Management (MD61). It represents anticipated demand (forecast) independent of actual sales orders and is consumed by incoming customer orders depending on the planning strategy.

  19. What is the role of the Planning Strategy in Demand Management?

    The planning strategy (e.g., 10 Make-to-Stock, 20 Make-to-Order, 40 Planning with Final Assembly) controls how PIRs and sales orders interact, whether production is triggered by forecast or by orders, and how requirements are consumed.

  20. Compare Make-to-Stock (MTS) and Make-to-Order (MTO) production.

    MTS produces finished goods to anonymous stock based on forecast/PIRs before orders arrive (strategies 10/40). MTO produces specifically against individual sales orders, with stock kept as sales-order stock and no anonymous warehouse buildup (strategy 20/50).

Show the other 45 SAP PP flashcards
  1. What is Material Requirements Planning (MRP) in SAP?

    MRP (run via MD01 total / MD02 single-item multi-level / MD03 single-item single-level) calculates net requirements, determines procurement quantities and dates, and generates planned orders or purchase requisitions to ensure material availability while minimizing stock.

  2. State the basic net requirements calculation logic used by MRP.

    MRP computes available quantity as: $\text{Available} = \text{Plant stock} + \text{Firmed receipts} - \text{Requirements}$. When available stock falls below the reorder point / safety stock, a shortage exists and MRP creates a procurement proposal to cover it.

  3. What are the main MRP procedures configured in the Material Master MRP 1 view?

    MRP types include PD (MRP / deterministic planning), VB (manual reorder point), VM (automatic reorder point), VV (forecast-based planning), and ND (no planning).

  4. What is the difference between reorder-point planning and consumption-based (forecast-based) planning?

    Reorder-point planning (VB/VM) triggers procurement when stock drops below a defined reorder level. Forecast-based planning (VV) uses historical consumption and a forecast model to project future requirements. Both are consumption-based, not requirements-based like PD.

  5. What procurement proposals can an MRP run generate?

    For in-house production: Planned Orders. For external procurement: Purchase Requisitions (or schedule lines for scheduling agreements). Planned orders can later be converted to production/process orders or purchase requisitions.

  6. What are the common Lot-Sizing procedures in MRP?

    Static (e.g., EX exact/lot-for-lot, FX fixed lot, HB replenish to maximum), Periodic (e.g., daily, weekly, monthly grouping of requirements), and Optimizing (e.g., part-period balancing, least-unit cost).

  7. What is the meaning of MRP processing key NETCH vs NETPL vs NEUPL?

    NEUPL = regenerative planning (plans all materials). NETCH = net change planning (plans only materials changed since the last run). NETPL = net change planning within the planning horizon only (short-term focus).

  8. In an MRP run, what do the create indicators (Purchase requisition, Delivery schedule, MRP list) control?

    They control the run's outputs: whether MRP creates purchase requisitions vs planned orders (indicator 1/2/3), whether it generates schedule lines for scheduling agreements, and whether it writes MRP lists for later evaluation.

  9. What is Long-Term Planning (LTP) in SAP PP?

    LTP is a simulative planning tool that runs MRP in a separate planning scenario (using a simulative version of PIRs) to test future demand situations โ€” checking capacity, materials, and vendor requirements โ€” without affecting the operative plan.

  10. How does the LTP process work at a high level?

    Create a planning scenario (MS31) with simulative PIRs and a planning period, release it, run the LTP MRP (MS01/MS02), then evaluate the simulative results (stock/requirements list MS04, capacity, purchasing info) to support decisions before adopting them operatively.

  11. What is a key difference between operative MRP and LTP?

    Operative MRP updates real planning data and creates real procurement proposals; LTP works in an isolated simulative scenario with an inactive planning version, producing simulative planned orders/requirements that do not affect operations or stock.

  12. What is a Planned Order in SAP PP?

    A planned order (MD11 create) is a procurement proposal generated by MRP (or manually) that requests production of a material in a given quantity by a given date. It is not yet firm and is later converted into a production order, process order, or purchase requisition.

  13. How is a planned order converted, and what transaction is used for collective conversion to production orders?

    A single planned order is converted via MD11/MD04 (or CO40); collective conversion of planned orders to production orders uses CO41. Conversion to purchase requisitions uses MD14 (single) / MD15 (collective).

  14. What is a Production Order in SAP PP?

    A production order (CO01 create, CO02 change, CO03 display) is a firm shop-floor document (used in discrete manufacturing) that specifies what material to produce, in what quantity, by when, which operations/work centers to use, and which components to consume; it also collects actual costs.

  15. List the main life-cycle steps of a production order.

    Create โ†’ Release (CO02, enables printing/goods issue) โ†’ Print shop papers โ†’ Goods issue of components โ†’ Confirmation of operations (CO11N) โ†’ Goods receipt of finished product โ†’ Settlement (CO88/KO88) โ†’ Technical completion/Close.

  16. What is the purpose of releasing a production order?

    Release (status REL) makes the order executable: it allows printing of shop-floor papers, goods issues, confirmations, and goods receipts. Before release the order is only created (CRTD) and cannot post actual movements.

  17. What is order confirmation (CO11N) in production order processing?

    Confirmation records the actual progress of operations โ€” actual quantities produced, scrap, and activity times (setup/machine/labor). It updates costs, capacity load, and can trigger automatic goods issue (backflush) and goods receipt via milestone/final confirmation.

  18. What is backflushing in SAP PP?

    Backflushing is the automatic posting of component goods issues at the time of confirmation (rather than manually), based on the BOM quantities. It is set via an indicator in the Material Master/work center and is standard in repetitive manufacturing.

  19. What is a Process Order and how does it differ from a Production Order?

    A Process Order (COR1 create, COR2 change, COR3 display) is used in process industries (chemicals, pharma, food) and uses a Master Recipe instead of a routing, supports phases/process instructions, control recipes, and batch management โ€” whereas a production order uses a routing and suits discrete manufacturing.

  20. In process industries, what master data replaces the BOM+Routing combination?

    A Master Recipe (C201/C202/C203) โ€” it combines the operation/phase structure (like a routing) with material assignments, and works together with the BOM; production is driven by the master recipe within a production version.

  21. What is Repetitive Manufacturing (REM) in SAP PP?

    REM is a production type for high-volume, continuous flow of the same/similar products over production lines, planned by period and quantity (rate) rather than by individual lot-based orders. It uses run schedule quantities and backflushing instead of production orders.

  22. Name key differences between Repetitive Manufacturing and Discrete (order-based) Manufacturing.

    REM: period/rate-based planning, no individual production orders (uses planned orders/run schedules), cost collector for period costing, backflush confirmation, stable production lines. Discrete: lot/order-based, individual production orders per lot, order-based costing, suited to changing products and complex routings.

  23. What is a Product Cost Collector in Repetitive Manufacturing?

    A Product Cost Collector (KKF6N) is the cost object that collects production costs by material/production version over a period in REM (and can be used in order-related production), rather than collecting costs on individual orders.

  24. What is SAP APO (Advanced Planning and Optimization)?

    APO is the advanced planning component of SAP SCM that provides tools for demand planning, supply network planning, production planning & detailed scheduling (PP/DS), and global available-to-promise, using a real-time in-memory liveCache and constraint-based optimization beyond standard ECC MRP.

  25. What are the main application modules within SAP APO?

    Demand Planning (DP), Supply Network Planning (SNP), Production Planning and Detailed Scheduling (PP/DS), Global Available-to-Promise (gATP), and Transportation Planning/Vehicle Scheduling (TP/VS).

  26. What is Detailed Scheduling in the context of production planning?

    Detailed Scheduling is finite, resource-level sequencing of operations that assigns exact start/end times on constrained resources, resolves conflicts, minimizes setup and lead time, and optimizes the sequence โ€” going beyond MRP's infinite scheduling to respect real capacity limits.

  27. What is the difference between infinite and finite scheduling?

    Infinite scheduling (standard ECC MRP) schedules operations assuming unlimited capacity, ignoring overloads. Finite scheduling (PP/DS, detailed scheduling) respects each resource's available capacity, so it never overloads a resource and produces a realistic, executable sequence.

  28. What is PP/DS (Production Planning and Detailed Scheduling) in APO / S/4HANA?

    PP/DS is the APO/S4 component for short-term, constraint-based production planning and finite detailed scheduling of critical products and bottleneck resources. It creates and sequences planned/production orders using the liveCache and optimizer, and integrates tightly with ECC/S4 via CIF.

  29. What is the CIF (Core Interface) in APO?

    The Core Interface (CIF) is the real-time integration link that transfers master and transactional data between the ERP/ECC system and APO (SCM), using integration models to select which objects (materials, work centers, BOMs, orders) are shared and kept in sync.

  30. In PP/DS, what is a PPM or PDS?

    A PPM (Production Process Model) or PDS (Production Data Structure) is the APO/PP-DS master data that represents the sources of supply โ€” the combination of BOM, routing/recipe, and resources used to produce a product โ€” analogous to a production version in ECC. PDS is the newer, CIF-transferred form; PPM the older maintainable form.

  31. What are the main components of an APO PP/DS heuristic-based planning run?

    Heuristics (algorithmic planning procedures, e.g., product heuristic for net requirements), the Optimizer (cost-based finite sequencing), and Detailed Scheduling board (DS planning board) for interactive manual sequencing on resources.

  32. What is the Stock/Requirements List and what transaction displays it?

    The Stock/Requirements List (MD04) is a dynamic, real-time report showing current stock plus all planned and firmed receipts/requirements (orders, PIRs, reservations) for a material, used to analyze the supply/demand situation. MD05 shows the static MRP list from the last MRP run.

  33. What is the difference between MD04 (Stock/Requirements List) and MD05 (MRP List)?

    MD04 is dynamic โ€” it always reflects the current situation in real time. MD05 (MRP List) is static โ€” it shows the situation as of the last MRP run and does not change until MRP runs again. MD05 is useful to see what the MRP run actually did.

  34. Which standard report shows documented goods movements for a production order or material?

    MB51 (Material Document List) displays goods movements; for a production order, the Order Information System / documented goods movements can also be viewed via CO03 and COOIS. MMBE shows the current stock overview by plant/storage location/batch.

  35. What is COOIS used for in SAP PP?

    COOIS (Production Order Information System) is the central reporting tool for production/process orders, allowing selection and analysis of orders, operations, components, confirmations, documented goods movements, and capacities with flexible filters and list types.

  36. What standard report/tool is used for capacity evaluation and leveling in PP?

    CM01 (Capacity Load / Work Center view) and related CM05/CM07 for capacity evaluation, and CM21/CM25 (planning table / graphical leveling) for capacity leveling โ€” used to compare available vs required capacity and dispatch operations.

  37. How is capacity utilization (load) of a work center calculated?

    Capacity load percentage is $\text{Utilization} = \frac{\text{Capacity requirement}}{\text{Available capacity}} \times 100\%$, where available capacity = operating time per shift ร— number of individual capacities ร— utilization rate, over the shift schedule.

  38. How is the available capacity of a work center per day computed in SAP?

    $\text{Available capacity} = (\text{end} - \text{start} - \text{break}) \times \dfrac{\text{utilization}\%}{100} \times (\text{no. of individual capacities})$. For example an 8-hour shift at 90% utilization with 2 machines gives $8 \times 0.9 \times 2 = 14.4$ hours.

  39. What are the standard scheduling types available when scheduling a production order?

    Forward scheduling (from basic start date forward), Backward scheduling (from basic finish date backward โ€” the default), Today scheduling (forward from current date), and Only capacity requirements (no dates). Backward is most common so the order finishes on the required date.

  40. What is total lead time (throughput time) composed of for an operation?

    Throughput time = queue time + setup time + processing (machine) time + wait time + move (transport) time. In SAP the operation's processing time is often computed as $\text{Machine time} = \dfrac{\text{Base quantity related time} \times \text{Order quantity}}{\text{Base quantity}}$.

  41. What is a Reservation in SAP PP and when is it created?

    A reservation is a request to the warehouse to keep components available for a future goods issue. For production/process orders, dependent reservations for BOM components are generated automatically when the order is created, ensuring material is earmarked for that order.

  42. What is Order Settlement in production order processing and which transaction performs it?

    Settlement (CO88 collective / KO88 individual) transfers the actual costs collected on the production order to the settlement receiver (typically the material stock or a cost object), clearing the order balance and calculating variances between actual and target/standard costs.

  43. What are production order variances and how are they conceptually derived?

    Variances are differences between actual costs charged to the order and the target (planned/standard) costs for the delivered quantity, $\text{Variance} = \text{Actual cost} - \text{Target cost}$. Categories include input price, quantity, resource-usage, lot-size, output price, and scrap variances, calculated before settlement.

  44. What is a Master Recipe's relationship to phases and the control recipe in process manufacturing?

    A master recipe defines operations that are subdivided into phases (the actual self-contained work steps). During process order execution, process instructions in the phases generate a control recipe/PI sheet sent to the process control system (or operator) to run and record the batch.

  45. What is the standard SAP strategy group vs strategy in planning, and where is it assigned?

    A planning strategy defines a single planning method (e.g., 40); a strategy group bundles a main strategy plus permitted alternatives. The strategy group is assigned in the Material Master MRP 3 view and governs how PIRs and sales orders are planned and consumed.

SAP SAP PP FAQ

What is in the SAP SAP PP syllabus?

SAP SAP PP is split into 7 chapters: Introduction to SAP PP, Master Data in SAP PP, Production Planning, Production Execution, Advanced Planning and Optimization (APO), Reporting and Analytics in SAP PP and Integration with Other Modules. Together they contain 24 topics and 72 sub-topics.

How many chapters are in SAP SAP PP?

7 chapters, containing 24 topics and 72 sub-topics. The largest chapter is Master Data in SAP PP, with 5 topics.

Are there flashcards for SAP SAP PP?

Yes โ€” a 65-card SAP PP deck, printed in full in the flashcards section of this page and available in the Examius app with spaced repetition. The free plan covers one exam of your choice, including its flashcards; Examius Pro, a one-time purchase, unlocks every other exam and deck.