Fundamentals of Surveying Exam (FS) Construction, Engineering, and Specialty Surveys Syllabus
The Construction, Engineering, and Specialty Surveys syllabus for Fundamentals of Surveying Exam (FS) in full: 3 chapters, 9 topics and 17 sub-topics, every one listed below, plus 51 Construction, Engineering, and Specialty Surveys flashcards with answers.
Construction, Engineering, and Specialty Surveys syllabus: all 3 chapters
Expand any chapter to see its topics and sub-topics.
-
Construction Surveying
3 topics- Construction Staking
- Layout of buildings, utilities, and offsets
- Cut and fill stakes and grade computations
- Control for Construction
- Primary and secondary control networks
- As-built and record surveys
- Earthwork and Quantities
- Average end-area and prismoidal volumes
- Mass haul and grading
- Construction Staking
-
Route and Horizontal/Vertical Curves
3 topics- Horizontal Curves
- Degree of curve, radius, tangent, and length
- Deflection angles and curve stationing
- Vertical Curves
- Symmetrical parabolic curves
- High/low point and elevations on the curve
- Spiral (Transition) Curves
- Spiral geometry and superelevation
- Horizontal Curves
-
Geodetic and High-Precision Surveys
3 topics- Control Survey Standards
- Orders and classes of accuracy
- FGCS and NGS specifications
- Deformation and Monitoring Surveys
- Structural and ground movement monitoring
- Repeat observation and analysis cycles
- Hydrographic and Bathymetric Surveys
- Sounding methods and tidal datums
- Shoreline and underwater feature mapping
- Control Survey Standards
Fundamentals of Surveying Exam (FS) Construction, Engineering, and Specialty Surveys flashcards β 51 questions with answers
What is construction staking (construction layout)?
The process of transferring the locations, lines, grades, and dimensions shown on design/construction plans onto the ground using stakes and marks, so contractors can build features in their correct horizontal and vertical positions.
On a typical grade/offset stake, what do the markings 'C 2.5' and 'F 1.0' indicate?
'C' means cut (the point is below the stake reference, so material must be removed) of $2.5$ ft, and 'F' means fill (point is above, material must be added) of $1.0$ ft. The number is the vertical distance from the reference mark to design grade.
Why are offset (reference) stakes used in construction staking instead of staking directly on the line?
Because stakes set directly on the centerline or feature would be destroyed during excavation/construction. Offset stakes are placed a known horizontal distance to the side so they survive grading and can be used to re-establish line and grade.
Define 'blue top' stakes in construction grading.
Stakes driven so that the top of the stake (marked with blue keel/paint) is exactly at finished subgrade or finished grade elevation, allowing equipment operators to grade directly to the stake tops.
What is a slope stake?
A stake set at the catch point (where the cut or fill slope intersects the existing ground) that records the cut/fill, the slope ratio, and the offset distance from centerline to that intersection.
How is a slope ratio such as 2:1 interpreted in earthwork?
As horizontal:vertical. A $2{:}1$ slope rises $1$ unit vertically for every $2$ units horizontally, i.e., a grade of $\frac{1}{2}=50\%$.
What three coordinate/position elements must construction control provide for layout work?
Accurate horizontal position (Northing/Easting), accurate vertical position (elevation), and orientation (azimuth/bearing), all tied to a consistent project datum and coordinate system.
Why must construction control be established to a higher accuracy than the features being staked?
Because layout error accumulates from the control. The control network should be at least one order of accuracy better so that errors in control are negligible relative to the construction tolerances of the staked features.
What is a primary vs. secondary construction control network?
Primary control consists of a few highly accurate, permanent, widely spaced monuments establishing the project framework; secondary control consists of densified working points set from the primary network, closer to the work for daily layout.
Why are control monuments for construction placed outside the active construction/grading limits?
To prevent disturbance, burial, or destruction by heavy equipment and excavation so they remain stable and usable throughout the project.
What is the average end area method for computing earthwork volume between two cross sections?
$$V=\frac{L}{2}\left(A_{1}+A_{2}\right)$$ where $A_{1}$ and $A_{2}$ are the cross-sectional areas and $L$ is the distance between the two sections.
Write the prismoidal formula for earthwork volume and state when it is preferred over the average end area method.
$$V=\frac{L}{6}\left(A_{1}+4A_{m}+A_{2}\right)$$ where $A_{m}$ is the area at the midsection. It is more accurate for prismoidal (warped/curved) solids; the average end area method overestimates volume for these shapes.
What is a shrinkage factor in earthwork, and how does it affect the volume of fill required?
Shrinkage accounts for the fact that excavated soil compacts in fill to less volume than in its undisturbed (in-situ) state. Because compacted fill is denser, more bank-volume material is needed; a $10\%$ shrinkage means $1.10$ cubic yards of cut produce $1.0$ cubic yard of compacted fill.
What is the swell factor in earthwork?
The volume increase of soil when excavated and loosened relative to its in-place (bank) volume. Loose/hauled volume exceeds bank volume, so swell is used when computing truck haul quantities.
On a mass haul diagram, what does a rising curve segment represent, and what does the maximum/minimum of the curve indicate?
A rising segment represents an excavation (cut) region (cumulative volume increasing). Maxima and minima of the mass diagram occur where the ground passes through grade (cut changes to fill or vice versa).
On a mass haul diagram, what does a horizontal balance line indicate?
A horizontal line cutting the curve where it intersects at two points indicates a balanced haul: the cut volume equals the fill volume between those stations, so no net import or export of material is required over that reach.
Convert 1 acre and 1 cubic yard to the units commonly used in earthwork in the US customary system.
$1\ \text{acre}=43{,}560\ \text{ft}^{2}$ and $1\ \text{cubic yard}=27\ \text{ft}^{3}$.
Define the degree of curve by the arc definition for a horizontal circular curve.
The central angle subtended by an arc of $100$ ft. By the arc definition, $$D=\frac{5729.58}{R}$$ (degrees), where $R$ is the radius in feet.
For a simple horizontal circular curve, give the formulas for tangent distance $T$ and length of curve $L$ in terms of $R$ and deflection angle $\Delta$.
$$T=R\tan\frac{\Delta}{2},\qquad L=R\,\Delta\,\frac{\pi}{180}=\frac{100\,\Delta}{D}$$ where $\Delta$ is the central (intersection) angle.
Give the formulas for the long chord $LC$, external distance $E$, and middle ordinate $M$ of a simple horizontal curve.
$$LC=2R\sin\frac{\Delta}{2},\quad E=R\left(\sec\frac{\Delta}{2}-1\right),\quad M=R\left(1-\cos\frac{\Delta}{2}\right)$$
Show the other 31 Construction, Engineering, and Specialty Surveys flashcards
In horizontal curve geometry, what do PC, PI, and PT stand for?
PC = Point of Curvature (beginning of curve, where tangent meets curve); PI = Point of Intersection (where the two tangents intersect); PT = Point of Tangency (end of curve, where curve meets the forward tangent).
How is the station of the PT computed from the station of the PC and the curve length?
$$\text{Sta}_{PT}=\text{Sta}_{PC}+L$$ The PT is found by adding the curve length $L$ along the curve to the PC station (NOT by adding $2T$ through the PI).
What is the deflection angle to any point on a horizontal curve from the PC, in terms of the arc length $\ell$ to that point?
$$\delta=\frac{\ell}{2R}\ \text{(radians)}=\frac{D\,\ell}{200}\ \text{(degrees)}$$ The deflection from the back tangent equals half the central angle subtended by the arc.
What is superelevation on a horizontal curve and what is its purpose?
The banking (cross-slope) of the roadway on a curve so the pavement is higher on the outside edge. It counteracts centrifugal force, allowing vehicles to negotiate the curve at design speed with reduced reliance on side friction.
Give the basic equation relating superelevation rate $e$, side friction $f$, design speed $V$, and curve radius $R$.
$$e+f=\frac{V^{2}}{gR}$$ In US customary form with $V$ in mph and $R$ in ft: $$e+f=\frac{V^{2}}{15R}$$
What defines an equal-tangent vertical (parabolic) curve, and why is a parabola used?
It has equal horizontal tangent lengths each side of the vertex (PVI), with the curve length $L$ split evenly. A parabola is used because it produces a constant rate of change of grade, giving a smooth, uniform vertical acceleration.
For an equal-tangent vertical curve, write the elevation equation along the curve.
$$y=y_{PVC}+g_{1}x+\frac{(g_{2}-g_{1})}{2L}x^{2}$$ where $x$ is horizontal distance from the PVC, $g_{1},g_{2}$ are entering/exiting grades, and $L$ is the curve length.
What is the rate of change of grade $r$ on a vertical curve, and how is it used?
$$r=\frac{g_{2}-g_{1}}{L}$$ (per station). It is constant along the parabola and is used in the elevation equation $y=y_{PVC}+g_{1}x+\frac{r}{2}x^{2}$ and to evaluate ride comfort/sight distance.
How do you locate the high or low point of a vertical curve (the turning point)?
Set the first derivative of the elevation equation to zero. The distance from the PVC is $$x_{t}=\frac{-g_{1}L}{g_{2}-g_{1}}=\frac{-g_{1}}{r}$$ valid when a true high/low point exists (grades of opposite sign).
Distinguish a crest vertical curve from a sag vertical curve by the sign of the grades.
A crest curve occurs when the algebraic difference $A=g_{2}-g_{1}$ is negative (e.g., +grade to -grade), forming a hill. A sag curve occurs when $A=g_{2}-g_{1}$ is positive (e.g., -grade to +grade), forming a valley.
What is the K-value of a vertical curve and how is it defined?
$$K=\frac{L}{A}$$ where $A=|g_{2}-g_{1}|$ in percent and $L$ is the curve length in feet. $K$ is the horizontal distance (ft) required to change grade by $1\%$; it is used to design curves for required sight distance.
What is the middle ordinate (mid-curve offset) of an equal-tangent vertical curve from the PVI?
$$m=\frac{A\,L}{8}$$ (with $A$ in decimal grade and $L$ in same units, or $\frac{AL}{800}$ with $A$ in percent and $L$ in ft) β the vertical offset from the PVI tangent intersection to the curve at its midpoint.
What is the primary controlling design criterion for crest vertical curves versus sag vertical curves?
Crest curves are controlled by stopping sight distance (line of sight over the crest). Sag curves are typically controlled by headlight sight distance at night (and also comfort, drainage, and overhead clearance).
What is a spiral (transition) curve and why is it inserted between a tangent and a circular curve?
A curve whose radius varies continuously from infinity (at the tangent) to the radius $R$ of the circular curve. It provides a gradual introduction of curvature and superelevation, eliminating the abrupt lateral acceleration of a tangent-to-circle transition.
What geometric property defines the clothoid (Euler spiral) used as a highway transition curve?
Its curvature increases linearly with arc length: the radius of curvature $\rho$ is inversely proportional to distance $\ell$ along the spiral, so $\rho\,\ell=R\,L_{s}=\text{constant}=A^{2}$.
What is the spiral angle (central angle of the spiral) $\theta_{s}$ in terms of spiral length $L_{s}$ and end radius $R$?
$$\theta_{s}=\frac{L_{s}}{2R}\ \text{(radians)}=\frac{L_{s}\,D}{200}\ \text{(degrees)}$$ where $D$ is the degree of the circular curve.
In a spiraled curve layout, what do the points TS, SC, CS, and ST denote?
TS = Tangent-to-Spiral (start of entry spiral); SC = Spiral-to-Curve (entry spiral meets circular arc); CS = Curve-to-Spiral (circular arc meets exit spiral); ST = Spiral-to-Tangent (end of exit spiral).
What is the shift (throw) $p$ of a spiral curve and what does it represent?
$$p\approx\frac{L_{s}^{2}}{24R}$$ It is the small inward offset of the circular curve from the tangent caused by inserting the spiral; the circular arc is shifted toward the center by $p$ to accommodate the transition.
What general accuracy standards classify geodetic control surveys in the US?
The FGCS/FGCC orders: First Order (highest accuracy, e.g. $1{:}100{,}000$), Second Order Class I ($1{:}50{,}000$) and Class II ($1{:}20{,}000$), and Third Order Class I ($1{:}10{,}000$) and Class II ($1{:}5{,}000$), defined by relative positional accuracy between control points.
How are modern GNSS/GPS relative accuracy standards (FGDC) expressed, and how do they differ from older closure-ratio standards?
They are expressed as local and network accuracy at the $95\%$ confidence level in absolute distance terms (e.g., $\pm 1$ cm local, network accuracy relative to the national datum), rather than as a proportional closure ratio like $1{:}100{,}000$ between two points.
What does a relative accuracy/closure standard of $1{:}50{,}000$ mean for a control survey?
That the misclosure (positional error) is no more than $1$ unit per $50{,}000$ units of distance surveyed β e.g., a maximum error of $1$ ft in $50{,}000$ ft of line, or equivalently $0.02$ ft per $1000$ ft.
What is the difference between a horizontal datum and a vertical datum in control surveying?
A horizontal datum (e.g., NAD83) defines latitude/longitude/Northing-Easting positions on a reference ellipsoid; a vertical datum (e.g., NAVD88) defines orthometric heights/elevations referenced to a geoid/equipotential surface.
What is a deformation (monitoring) survey?
A repeated survey of a structure or natural feature over time to detect and measure movement (settlement, displacement, tilt, or strain) by comparing positions of monitoring points between epochs against stable reference points.
In deformation monitoring, distinguish reference (datum) points from object (target) points.
Reference points are located on stable ground outside the zone of expected movement and assumed fixed; object points are placed on the monitored structure and their position changes relative to the reference network reveal deformation.
How is detected movement distinguished from measurement noise in a deformation survey?
By statistical testing: a displacement is considered significant only if it exceeds the survey's measurement uncertainty (e.g., exceeds $2\sigma$ or $3\sigma$ at a chosen confidence level). Movement within the error band is treated as noise, not real deformation.
Name three instruments/techniques commonly used for high-precision deformation monitoring.
Precise (geodetic) total stations with automatic target recognition, precise digital/geodetic leveling, GNSS arrays, and complementary geotechnical sensors such as tiltmeters, extensometers, and InSAR/laser scanning.
What is a hydrographic survey?
A survey to map and measure the physical features of bodies of water and their adjacent land β water depth, bottom configuration, shoreline, currents, and hazards β primarily to support navigation, dredging, and marine construction.
What is bathymetry and what is the primary instrument used to measure it?
Bathymetry is the measurement and mapping of underwater depth (the topography of the seabed/lakebed). It is primarily measured with an echo sounder (single-beam or multibeam sonar) that times acoustic pulses to the bottom.
How does a single-beam echo sounder compute water depth from a sound pulse?
$$d=\frac{c\,t}{2}$$ where $c$ is the speed of sound in water (about $1500$ m/s, varies with temperature, salinity, pressure) and $t$ is the two-way travel time; division by 2 accounts for the round trip.
Contrast single-beam and multibeam echo sounders for bathymetric surveying.
A single-beam sounder measures depth directly below the vessel along a single track, giving sparse line coverage. A multibeam system emits a fan of beams perpendicular to the track, giving a wide swath of full-bottom coverage in one pass, far higher resolution and efficiency.
In hydrographic surveying, why must measured depths (soundings) be corrected for tide/water-level, and to what are they reduced?
Because the water surface changes height with tides, the raw sounding from the transducer must be reduced by the instantaneous water level to a fixed reference datum β typically a chart datum such as Mean Lower Low Water (MLLW) β so charted depths are consistent and conservative for navigation.
Fundamentals of Surveying Exam (FS) Construction, Engineering, and Specialty Surveys FAQ
What is in the Fundamentals of Surveying Exam (FS) Construction, Engineering, and Specialty Surveys syllabus?
Fundamentals of Surveying Exam (FS) Construction, Engineering, and Specialty Surveys is split into 3 chapters: Construction Surveying, Route and Horizontal/Vertical Curves and Geodetic and High-Precision Surveys. Together they contain 9 topics and 17 sub-topics.
How many chapters are in Fundamentals of Surveying Exam (FS) Construction, Engineering, and Specialty Surveys?
3 chapters, containing 9 topics and 17 sub-topics. The largest chapter is Construction Surveying, with 3 topics.
Are there flashcards for Fundamentals of Surveying Exam (FS) Construction, Engineering, and Specialty Surveys?
Yes β a 51-card Construction, Engineering, and Specialty Surveys deck, printed in full in the flashcards section of this page and available in the Examius app with spaced repetition. The free plan covers one exam of your choice, including its flashcards; Examius Pro, a one-time purchase, unlocks every other exam and deck.