Certified Associate in Project Management (CAPM) Predictive (Plan-Based) Project Management Methodologies Syllabus
The Predictive (Plan-Based) Project Management Methodologies syllabus for Certified Associate in Project Management (CAPM) in full: 5 chapters, 26 topics and 39 sub-topics, every one listed below, plus 53 Predictive (Plan-Based) Project Management Methodologies flashcards with answers.
Predictive (Plan-Based) Project Management Methodologies syllabus: all 5 chapters
Expand any chapter to see its topics and sub-topics.
-
Integration and Scope Management
7 topics- Develop project charter and authorize the project
- Inputs: business case, agreements, EEFs/OPAs
- High-level requirements and success criteria
- Develop and integrate the project management plan
- Direct and manage project work; manage project knowledge
- Collect requirements and define scope
- Requirements traceability matrix
- Scope statement and acceptance criteria
- Create the Work Breakdown Structure (WBS)
- Decomposition into work packages
- WBS dictionary and control accounts
- Validate scope and control scope (avoiding scope creep)
- Perform integrated change control
- Develop project charter and authorize the project
-
Schedule Management
6 topics- Define and sequence activities
- Precedence Diagramming Method (PDM)
- Finish-to-start, start-to-start, finish-to-finish, start-to-finish
- Leads and lags
- Estimate activity durations
- Analogous, parametric, and three-point (PERT) estimating
- Reserve analysis for schedule
- Develop schedule and the Critical Path Method (CPM)
- Forward and backward pass
- Total float and free float
- Identifying the critical path
- Schedule compression
- Crashing vs. fast-tracking trade-offs
- Schedule baseline and control schedule
-
Cost Management
4 topics- Estimate costs
- Rough order of magnitude vs. definitive estimates
- Cost of quality considerations
- Determine budget and the cost baseline
- Aggregating costs and contingency reserves
- Management reserves and funding limits
- Earned Value Management (EVM)
- Planned value, earned value, and actual cost
- Cost and schedule variance (CV, SV)
- Cost and schedule performance index (CPI, SPI)
- Estimate at completion (EAC) and to-complete index (TCPI)
- Control costs and forecast performance
- Estimate costs
-
Quality, Resource, and Communications Management
4 topics- Plan and manage quality
- Cost of conformance vs. nonconformance
- Quality assurance vs. quality control
- Seven basic quality tools (fishbone, Pareto, control charts)
- Estimate and acquire resources
- Resource management plan and team charter
- Responsibility assignment matrix (RACI)
- Develop and manage the team
- Tuckman ladder stages
- Recognition, rewards, and team performance
- Plan and manage communications
- Communication channels formula n(n-1)/2
- Push, pull, and interactive communication
- Plan and manage quality
-
Risk, Procurement, and Closing
5 topics- Plan risk management and identify risks
- Risk register and risk categories (RBS)
- Threats vs. opportunities
- Qualitative and quantitative risk analysis
- Probability and impact matrix
- Expected monetary value (EMV)
- Plan risk responses
- Threat strategies: avoid, transfer, mitigate, accept, escalate
- Opportunity strategies: exploit, share, enhance, accept, escalate
- Procurement processes and contract types
- Fixed-price, cost-reimbursable, and time-and-materials
- Make-or-buy analysis and source selection
- Control procurements and close the project or phase
- Plan risk management and identify risks
Certified Associate in Project Management (CAPM) Predictive (Plan-Based) Project Management Methodologies flashcards — 53 questions with answers
What document formally authorizes the existence of a project and gives the project manager authority to apply organizational resources?
The project charter. It is produced by the Develop Project Charter process and is signed by the project sponsor/initiator (a person external to the project with funding authority).
What are the two key inputs that typically precede and justify the development of a project charter?
A business case (the justification, often based on a cost-benefit analysis) and the benefits management plan, often summarized in a project's business documents along with any agreements/contracts.
What is the project management plan, and how does it differ from project documents?
The project management plan is the integrated, approved document defining how the project is executed, monitored, controlled, and closed. It consists of subsidiary management plans plus three baselines (scope, schedule, cost). Project documents (e.g., risk register, issue log) support but are not part of the plan.
What are the three performance baselines combined into the scope-schedule-cost performance measurement baseline (PMB)?
The scope baseline, the schedule baseline, and the cost baseline. Once approved, they can only be changed through formal integrated change control.
What does the Direct and Manage Project Work process produce as its primary outputs?
Deliverables, work performance data, issue log entries, change requests, and updates to the project management plan and documents. It is where the bulk of the project budget is spent executing the plan.
What is the difference between work performance data, work performance information, and work performance reports?
Data = raw observations/measurements gathered during execution. Information = data analyzed in context (e.g., comparing to baseline) within controlling processes. Reports = the physical or electronic representation of information compiled to generate decisions or awareness.
What is the goal of the Manage Project Knowledge process, and what two knowledge types does it address?
To use existing knowledge and create new knowledge to achieve objectives and contribute to organizational learning. It addresses explicit knowledge (codified in words/numbers) and tacit knowledge (personal, experience-based, harder to express). Its key output is the lessons learned register.
What is the difference between product scope and project scope?
Product scope = the features and functions that characterize the product/service/result. Project scope = the work needed to deliver that product with the specified features. Project scope is measured against the scope baseline; product scope is measured against product requirements.
What is the project scope statement and what does it include?
The output of Define Scope. It describes the product scope description, deliverables, acceptance criteria, and project exclusions (what is out of scope), providing a common understanding of project boundaries.
What three components make up the scope baseline?
The approved project scope statement, the WBS (Work Breakdown Structure), and the WBS dictionary (which also contains the work package details and planning packages).
What is a Work Breakdown Structure (WBS) and what is the lowest level called?
A hierarchical, deliverable-oriented decomposition of the total scope of work. The lowest level is the work package, where cost and duration can be reliably estimated and managed.
What is the 100 percent rule in WBS construction?
The WBS must include 100% of the work defined by the project scope—all deliverables and work, including project management—and nothing outside it. Child elements must sum to 100% of the parent.
What is a control account in relation to the WBS?
A management control point where scope, budget, and schedule are integrated and compared to earned value for performance measurement. A control account sits above work packages and may contain one or more work packages.
What is the difference between Validate Scope and Control Quality?
Control Quality checks deliverables for correctness against quality requirements (internal, often before validation). Validate Scope is about formal acceptance of completed deliverables by the customer/sponsor. Quality control is usually performed before scope validation.
What is scope creep and how does it differ from gold plating?
Scope creep is the uncontrolled expansion of scope without adjustments to time, cost, and resources (often customer-driven, no formal change control). Gold plating is the team adding extra features/work not requested by the customer. Both are avoided by controlling scope and following change control.
What is the purpose of Perform Integrated Change Control and when does it occur?
To review, approve/reject, and manage all change requests to deliverables, documents, baselines, and the project management plan. It occurs from project start through closure and is typically handled by a Change Control Board (CCB).
What are the four common dispositions of a change request in integrated change control?
Approved, rejected, deferred, or (in some texts) more granular outcomes; the key results are approved or rejected, then the change is recorded in the change log and, if approved, implemented and verified.
What is a rolling wave planning and how does it relate to defining activities?
An iterative planning technique where near-term work is planned in detail while future work is planned at a higher level. In Define Activities, near-term work packages are decomposed into activities while distant ones remain as planning packages.
What is the Precedence Diagramming Method (PDM), and what are its four logical relationship types?
PDM (Activity-on-Node) represents activities as nodes linked by dependencies. The four relationships are: Finish-to-Start (FS), Start-to-Start (SS), Finish-to-Finish (FF), and Start-to-Finish (SF). FS is the most common; SF is rarely used.
In schedule logic, what is the difference between lead and lag?
A lead allows a successor activity to start before the predecessor finishes (acceleration, e.g., FS minus 2 days). A lag delays a successor (e.g., FS plus 3 days for curing concrete). Leads compress; lags add waiting time.
Show the other 33 Predictive (Plan-Based) Project Management Methodologies flashcards
Distinguish mandatory, discretionary, external, and internal dependencies.
Mandatory (hard logic) = legally/contractually required or inherent in the work. Discretionary (preferred/soft logic) = based on best practice/preference. External = relationship between project and non-project activities. Internal = within the project team's control.
List three analogous, parametric, and three-point estimating differences for activity duration.
Analogous = top-down, uses past similar projects (fast, less accurate). Parametric = statistical relationship between variables (e.g., units x rate). Three-point = uses optimistic, most likely, pessimistic to account for uncertainty (PERT).
What are the triangular and beta (PERT) three-point estimate formulas?
Triangular: tE = (O + M + P) / 3. Beta/PERT: tE = (O + 4M + P) / 6, where O=optimistic, M=most likely, P=pessimistic. Beta weights the most likely value more heavily.
What is the PERT standard deviation formula for an activity?
Standard Deviation (SD) = (P − O) / 6, where P=pessimistic and O=optimistic. Variance = ((P − O) / 6)^2. Larger spread between O and P means greater uncertainty.
What is the Critical Path Method (CPM)?
A schedule analysis technique that calculates the longest path of dependent activities through the network, determining the shortest possible project duration. Activities on the critical path have zero total float.
Define total float and free float.
Total float = the time an activity can be delayed from its early start without delaying the project finish (or a constraint). Free float = the time an activity can be delayed without delaying the early start of any successor activity.
How do you calculate total float using early and late dates?
Total Float = Late Start (LS) − Early Start (ES), or equivalently Late Finish (LF) − Early Finish (EF). On the critical path, total float equals zero.
What are the forward pass and backward pass used for in CPM?
Forward pass calculates Early Start and Early Finish dates moving left to right (EF = ES + duration − 1 or +duration). Backward pass calculates Late Start and Late Finish moving right to left. Together they determine float and the critical path.
What is the difference between the two schedule compression techniques: crashing and fast tracking?
Crashing adds resources to critical activities to shorten duration—increases cost, may not change scope. Fast tracking performs activities in parallel that were planned in sequence—adds risk and possible rework, usually no added cost.
What is the schedule baseline and what is its relationship to Control Schedule?
The schedule baseline is the approved version of the schedule model used for comparison to actual results. Control Schedule monitors status, manages changes to the baseline, and uses variance analysis to keep the project on track.
What is a milestone and does it have duration?
A milestone is a significant point or event in a project (e.g., phase gate, deliverable completion). Milestones have zero duration because they represent moments in time, not work.
What are the main cost estimating types and what is the typical rough order of magnitude (ROM) range?
Estimate types include analogous, parametric, bottom-up, and three-point. A ROM estimate is typically −25% to +75%, while a definitive estimate is about −5% to +10%.
What is the difference between the cost baseline and the project budget?
Cost baseline = the approved, time-phased budget excluding management reserves (includes activity costs plus contingency reserves). Project budget = cost baseline + management reserves. Contingency reserves cover known risks; management reserves cover unknown risks.
What is the difference between contingency reserves and management reserves?
Contingency reserves address identified ('known-unknown') risks, are part of the cost baseline, and the PM can use them. Management reserves address unforeseen ('unknown-unknown') work, are outside the cost baseline, and require management approval to use.
Define the three core Earned Value Management metrics: PV, EV, and AC.
PV (Planned Value) = budgeted cost of work scheduled. EV (Earned Value) = budgeted cost of work actually performed (% complete x BAC). AC (Actual Cost) = actual cost incurred for the work performed.
What are the formulas for Cost Variance (CV) and Schedule Variance (SV), and how do you interpret them?
CV = EV − AC; SV = EV − PV. Negative = over budget / behind schedule; positive = under budget / ahead of schedule; zero = on target. EV always comes first.
What are the formulas for Cost Performance Index (CPI) and Schedule Performance Index (SPI)?
CPI = EV / AC; SPI = EV / PV. A value greater than 1 is favorable (under budget / ahead), less than 1 is unfavorable, and exactly 1 is on plan.
What is the Estimate at Completion (EAC) formula when current variances are typical (using CPI)?
EAC = BAC / CPI. This assumes the current cost performance trend will continue for the remaining work. (BAC = Budget at Completion.)
What is the Estimate to Complete (ETC) and the basic formula?
ETC is the expected cost to finish all remaining work. Basic formula: ETC = EAC − AC. It can also be re-estimated bottom-up if the original estimates are flawed.
What is Variance at Completion (VAC) and its formula?
VAC = BAC − EAC. It forecasts the budget surplus or deficit at project completion. Positive VAC means under budget; negative means over budget.
What is the To-Complete Performance Index (TCPI) based on BAC?
TCPI = (BAC − EV) / (BAC − AC). It is the cost performance that must be achieved on remaining work to meet the BAC. TCPI greater than 1 means efficiency must improve; less than 1 means there is slack.
What is the difference between the cost of conformance and the cost of nonconformance (Cost of Quality)?
Cost of conformance = money spent to prevent failures (prevention costs + appraisal costs, e.g., training, inspection). Cost of nonconformance = money spent due to failures (internal failure costs like rework + external failure costs like warranty/liability).
What is the difference between quality and grade, and between prevention and inspection?
Quality = degree to which requirements are met; Grade = category based on features (low grade can be acceptable, low quality is not). Prevention keeps errors out of the process (preferred); inspection keeps errors out of the customer's hands.
What is the difference between Manage Quality and Control Quality?
Manage Quality (quality assurance) is process-focused: auditing quality requirements and improving processes during execution. Control Quality is product-focused: inspecting deliverables for correctness during monitoring/controlling.
What is the difference between a RACI chart and a resource histogram?
A RACI chart (Responsible, Accountable, Consulted, Informed) is a responsibility assignment matrix (RAM) showing roles per activity. A resource histogram is a bar chart showing resource usage/allocation over time, often revealing over-allocation.
What are the five stages of Tuckman's team development ladder?
Forming, Storming, Norming, Performing, and Adjourning. Teams move through them as they mature, though they can regress (e.g., when new members join).
In communications planning, what is the formula for the number of communication channels?
Number of channels = n(n − 1) / 2, where n = number of stakeholders/people. Adding people increases channels rapidly (e.g., 6 people = 15 channels).
Distinguish the three main communication methods: interactive, push, and pull.
Interactive = real-time, multidirectional exchange (meetings, calls). Push = sent to specific recipients without confirmation of understanding (emails, reports). Pull = recipients access information at their discretion (intranet, knowledge repositories).
What is the difference between qualitative and quantitative risk analysis?
Qualitative risk analysis prioritizes risks subjectively using probability and impact (often a P-I matrix) to produce a risk ranking. Quantitative risk analysis numerically analyzes the combined effect on objectives (e.g., Monte Carlo, decision trees, EMV) and is not always performed.
What is Expected Monetary Value (EMV) and how is it calculated for a risk?
EMV = Probability x Impact. Threats use negative impact values, opportunities positive. EMV is used in decision tree analysis to choose among options by summing weighted outcomes.
What are the strategies for negative risks (threats) versus positive risks (opportunities)?
Threats: Escalate, Avoid, Transfer, Mitigate, Accept. Opportunities: Escalate, Exploit, Share, Enhance, Accept. Escalate and Accept are common to both; transfer/share often involve a third party.
What is the difference between fixed-price and cost-reimbursable contracts in terms of risk?
Fixed-price (e.g., FFP, FPIF, FP-EPA): buyer risk is low, seller bears cost-overrun risk. Cost-reimbursable (e.g., CPFF, CPIF, CPAF): buyer bears more cost risk by reimbursing actual costs plus a fee. Time & Materials (T&M) is a hybrid for staff augmentation or unclear scope.
What distinguishes Control Procurements and what is involved in Close Project or Phase?
Control Procurements manages procurement relationships, monitors contract performance, and makes changes/corrections, including formal contract closure. Close Project or Phase finalizes all activities, obtains final acceptance, archives records, captures final lessons learned, and releases resources.
Certified Associate in Project Management (CAPM) Predictive (Plan-Based) Project Management Methodologies FAQ
What is in the Certified Associate in Project Management (CAPM) Predictive (Plan-Based) Project Management Methodologies syllabus?
Certified Associate in Project Management (CAPM) Predictive (Plan-Based) Project Management Methodologies is split into 5 chapters: Integration and Scope Management, Schedule Management, Cost Management, Quality, Resource, and Communications Management and Risk, Procurement, and Closing. Together they contain 26 topics and 39 sub-topics.
How many chapters are in Certified Associate in Project Management (CAPM) Predictive (Plan-Based) Project Management Methodologies?
5 chapters, containing 26 topics and 39 sub-topics. The largest chapter is Integration and Scope Management, with 7 topics.
Are there flashcards for Certified Associate in Project Management (CAPM) Predictive (Plan-Based) Project Management Methodologies?
Yes — a 53-card Predictive (Plan-Based) Project Management Methodologies deck, printed in full in the flashcards section of this page and available in the Examius app with spaced repetition. The free plan covers one exam of your choice, including its flashcards; Examius Pro, a one-time purchase, unlocks every other exam and deck.