Architect Registration Examination (ARE) Project Planning and Design Syllabus
The Project Planning and Design syllabus for Architect Registration Examination (ARE) in full: 4 chapters, 16 topics and 22 sub-topics, every one listed below, plus 50 Project Planning and Design flashcards with answers.
Project Planning and Design syllabus: all 4 chapters
Expand any chapter to see its topics and sub-topics.
-
Design Concepts and Sustainability
4 topics- Design parti and concept development
- Translating program into spatial organization
- Form, massing, and design intent
- Passive and active sustainable strategies
- Daylighting, shading, and natural ventilation
- Renewable energy integration
- Sustainability rating systems
- LEED certification framework
- Life-cycle assessment and embodied carbon
- Site design and environmental response
- Design parti and concept development
-
Building Codes and Regulatory Compliance
4 topics- Code analysis for design
- Construction type and fire-resistance ratings
- Allowable area and height with increases
- Means of egress design
- Occupant load and exit capacity
- Travel distance and exit separation
- Accessibility-compliant design
- Accessible routes and clearances
- Restroom and element accessibility
- Energy code and envelope compliance
- Code analysis for design
-
Building Systems Integration in Design
4 topics- Structural systems selection
- Gravity and lateral load systems
- Material selection and grid coordination
- Mechanical, electrical, and plumbing integration
- Zoning and distribution strategies
- Spatial allocation for systems
- Vertical and horizontal circulation
- Stair, ramp, and elevator design
- Corridor and lobby planning
- Acoustics, lighting, and environmental comfort
- Structural systems selection
-
Materials, Assemblies, and Building Envelope
4 topics- Material properties and selection
- Performance, durability, and maintenance
- Aesthetic and functional criteria
- Building envelope design
- Thermal, air, and moisture barriers
- Wall, roof, and fenestration assemblies
- Fire and life safety assemblies
- Constructability and detailing principles
- Material properties and selection
Architect Registration Examination (ARE) Project Planning and Design flashcards β 50 questions with answers
What is a design "parti" in architectural design?
The central organizing idea or concept of a building's design β the fundamental scheme (often a simple diagram) that governs spatial organization, form, and the relationship of parts to the whole.
What is the difference between passive and active sustainable design strategies?
Passive strategies use building form, orientation, and materials to control comfort without mechanical energy (e.g., shading, thermal mass, natural ventilation). Active strategies use energy-consuming systems and equipment (e.g., HVAC, photovoltaics, mechanical ventilation).
For passive solar design in the Northern Hemisphere, which building orientation maximizes winter solar gain and allows easy summer shading?
A building elongated on the east-west axis with major glazing facing south, so high winter sun penetrates while high summer sun is easily blocked by horizontal overhangs.
What is thermal mass and how does it improve thermal comfort?
Thermal mass is dense material (concrete, masonry, water) that absorbs, stores, and slowly releases heat. It dampens temperature swings, delaying and reducing peaks (time lag and decrement factor), keeping interiors more stable.
What is the stack effect and how is it used for passive ventilation?
The stack (chimney) effect is the natural movement of air driven by temperature/density differences β warm air rises and exits high openings, drawing cooler air in through low openings. It drives buoyancy-driven natural ventilation.
Name the main LEED certification levels and their point thresholds (out of 110).
Certified 40β49 points, Silver 50β59, Gold 60β79, Platinum 80+ points.
What does LEED stand for and who administers it?
Leadership in Energy and Environmental Design, administered by the U.S. Green Building Council (USGBC), with certification through GBCI.
What is the Living Building Challenge and how does it differ from LEED?
A rigorous performance-based certification organized into seven "Petals" (Place, Water, Energy, Health & Happiness, Materials, Equity, Beauty). Unlike LEED's point system, it requires net-positive performance verified over 12 months of actual operation.
What does a building's "orientation and massing" response to site climate aim to balance?
Optimizing solar access, daylighting, prevailing breezes for ventilation, and shading/wind protection β balancing heat gain in cooling climates against heat retention in heating climates.
In site design, what is the purpose of a contour grading plan?
To show existing and proposed topography with contour lines, managing surface drainage, slopes, cut-and-fill balance, and accessibility while directing stormwater away from buildings.
What is the difference between cut and fill in site grading, and why is balancing them desirable?
Cut is excavated material removed; fill is added soil to raise grade. Balancing cut and fill on site minimizes hauling material on or off site, reducing cost and environmental impact.
What three pieces of information define the occupancy and use of a space in a building code analysis?
The occupancy classification (use group), the occupant load, and the construction type β which together govern allowable area, height, and required egress and fire protection.
List the major occupancy group classifications in the International Building Code (IBC).
A (Assembly), B (Business), E (Educational), F (Factory/Industrial), H (High-hazard), I (Institutional), M (Mercantile), R (Residential), S (Storage), and U (Utility/Miscellaneous).
How is occupant load calculated in the IBC?
Occupant load = floor area divided by the occupant load factor (area per occupant) from the code table for that use. The factors use gross or net area depending on the occupancy.
What are the five IBC construction types and what do they describe?
Types I through V, describing the fire-resistance/combustibility of structural elements: Type I (noncombustible, highest rated), II (noncombustible), III (noncombustible exterior, combustible interior), IV (heavy timber/mass timber), V (combustible, least restrictive).
Define "means of egress" and its three required components.
A continuous, unobstructed path of travel from any point in a building to a public way. Its three parts are the exit access, the exit, and the exit discharge.
What is the difference between common path of egress travel and travel distance?
Common path of egress travel is the portion you must traverse before reaching a point with two separate exit paths. Travel distance is the total length from the most remote point to an exit; both are code-limited by occupancy.
How is required egress width per occupant typically determined in the IBC?
Multiply occupant load by the egress width factor: commonly 0.3 inch per occupant for stairways and 0.2 inch per occupant for other components (level/doors), reduced to 0.2 and 0.15 with sprinklers and alarms.
When is a second exit (two exits) generally required from a space or story per the IBC?
When the occupant load or common path of travel exceeds code limits β generally when occupant load exceeds the table threshold (often 49 or as low as 30 for certain high-hazard uses) or the common path is exceeded.
Under the ADA/ANSI A117.1, what is the minimum clear width of an accessible route and an accessible door opening?
Accessible route minimum clear width is 36 inches (32 inches at a point such as a doorway, for a depth up to 24 inches). A door must provide 32 inches clear with the door open 90 degrees.
Show the other 30 Project Planning and Design flashcards
What is the maximum running slope and cross slope of an ADA-compliant ramp?
Maximum running slope 1:12 (8.33%), maximum cross slope 1:48 (about 2%). Maximum rise of 30 inches per run, with level landings at top, bottom, and changes of direction.
What is the required clear floor space for a single wheelchair, and the turning space dimensions?
A clear floor space of 30 by 48 inches for a stationary wheelchair. Turning space is either a 60-inch-diameter circle or a T-shaped space within a 60-inch square.
What is a building "climate zone" map used for in energy code compliance?
ASHRAE/IECC climate zones (1 hottest to 8 coldest) set minimum insulation R-values, U-factors, and envelope requirements appropriate to local heating and cooling demands.
What are the three compliance paths in the IECC for building envelope energy compliance?
Prescriptive (meet specific R-value/U-factor requirements per element), component/trade-off (UA tradeoff between assemblies), and performance (whole-building energy modeling vs. a baseline).
Distinguish R-value from U-factor in envelope design.
R-value measures thermal resistance of a material/assembly (higher = better insulator). U-factor is the rate of heat transfer through an assembly (U = 1/R for the total assembly; lower = better).
What is solar heat gain coefficient (SHGC) and why does it matter for glazing?
SHGC is the fraction of solar radiation admitted through a window (0β1). Lower SHGC reduces cooling loads in hot climates; higher SHGC can be beneficial for passive solar heating in cold climates.
Compare the three principal structural materials β steel, concrete, and wood β on a key design trade-off.
Steel: high strength-to-weight, fast erection, but needs fireproofing. Concrete: high compression strength, mass/fire resistance, but heavy and weak in tension (needs reinforcement). Wood: light, renewable, easy to work, but combustible and limited spans.
What is the difference between a one-way and a two-way structural slab/floor system?
A one-way system spans in a single direction to parallel supports (beams or walls). A two-way system spans in both directions to a grid of columns, efficient for square-ish bays and longer spans.
What structural concept describes the path loads take from application to the ground?
The load path β gravity and lateral loads transfer from slabs/decks to beams, to girders, to columns/walls, to foundations, and finally into the soil; every element must form a continuous path.
What is the difference between a shear wall, a braced frame, and a moment frame for lateral resistance?
A shear wall resists lateral loads through in-plane rigidity. A braced frame uses diagonal members in axial tension/compression. A moment frame resists lateral loads through rigid (moment-connected) beam-column joints, allowing open bays.
In MEP integration, what is a plenum and why is it significant in ceiling design?
A plenum is the enclosed space (often above a suspended ceiling or below a raised floor) used to distribute conditioned air or return air. It must be coordinated with structure, lighting, and fire-rating, and plenum-rated materials may be required.
What is the difference between an all-air, all-water, and air-water HVAC distribution system?
All-air systems deliver conditioning entirely via ducted air (e.g., VAV). All-water systems use piped water to terminal units (e.g., fan-coils, radiant). Air-water systems combine ducted ventilation air with water-based local heating/cooling (e.g., induction units, chilled beams).
Why are plumbing fixtures typically stacked vertically across floors in multistory buildings?
To align wet stacks (supply, waste, and vent risers) so piping runs are short and direct, reducing cost, leaks, and coordination conflicts β concentrating plumbing into shared chases.
What is the difference between vertical and horizontal circulation in a building?
Vertical circulation moves people/goods between floors (stairs, elevators, escalators, ramps). Horizontal circulation moves them across a floor (corridors, lobbies, hallways, bridges).
How is the number of required elevators for a building typically determined?
By traffic analysis based on building population, peak demand (e.g., 5-minute handling capacity), acceptable waiting/interval times, and travel height β balancing car size, speed, and number of cars.
What is the typical maximum rise (riser) and minimum run (tread) for a code-compliant egress stair?
In the IBC, maximum riser height is 7 inches and minimum tread depth is 11 inches for means-of-egress stairs (residential stairs in the IRC allow up to 7-3/4 inch riser, 10 inch tread).
What acoustic metric describes a partition's ability to block airborne sound, and what describes floor-ceiling impact noise?
Sound Transmission Class (STC) rates airborne sound isolation of a partition (higher = better). Impact Insulation Class (IIC) rates resistance to impact/structure-borne noise through floor-ceiling assemblies (higher = better).
What is reverberation time (RT60) and what affects it?
The time for sound to decay 60 decibels after the source stops. It increases with room volume and decreases with more absorptive surface area (Sabine's formula: RT = 0.049 V / A in IP units).
What is the difference between illuminance and luminance in lighting design?
Illuminance is the light falling on a surface, measured in footcandles (lux). Luminance is the light emitted or reflected from a surface toward the eye (brightness), measured in candela per square meter (or footlamberts).
What is the daylight factor and why is it used?
The ratio of interior daylight illuminance at a point to the simultaneous exterior horizontal illuminance under an overcast sky, expressed as a percent. It evaluates daylighting adequacy independent of absolute sky conditions.
Define a material's coefficient of thermal expansion and why it matters in detailing.
The amount a material expands or contracts per unit length per degree of temperature change. Dissimilar coefficients and large assemblies require expansion/control joints to prevent cracking, buckling, or sealant failure.
What is the difference between a material's strength in tension versus compression, using concrete and steel as examples?
Concrete is strong in compression but weak in tension, so it is reinforced with steel, which is strong in tension. Combining them in reinforced concrete lets each material carry the stress it handles best.
What are the four control layers of a high-performance building envelope (in order from exterior)?
The water control layer (drainage/WRB), air control layer (air barrier), vapor control layer (vapor retarder), and thermal control layer (insulation). They must be continuous and properly sequenced.
What is a rainscreen wall assembly and how does it manage water?
A cladding system with a ventilated/drained air cavity behind the exterior face and a water-resistive barrier on the backup wall. It allows pressure equalization and drains/dries any water that passes the cladding, keeping the structure dry.
What is the dew point and why is its location in a wall assembly important?
The temperature at which water vapor condenses. If the dew point falls within the wall where moisture-sensitive materials are, condensation occurs; insulation and vapor control must keep condensing surfaces above dew point or outside vulnerable layers.
What is a fire-rated assembly and how is its rating expressed?
A construction assembly (wall, floor, door) tested to resist fire for a specified duration, expressed in hours (e.g., 1-hour, 2-hour). The rating reflects the time it maintains structural/separation integrity under standard fire test (ASTM E119).
What is the difference between a fire wall, a fire barrier, and a fire partition?
A fire wall is the most robust, extending through the structure to subdivide a building into separate buildings (with structural continuity/collapse resistance). A fire barrier separates occupancies, shafts, and exits with continuity to rated floor/roof. A fire partition is a lighter rated wall (e.g., between dwelling units, corridors).
What is a firestop and where is it required?
A material or system that seals openings and joints in fire-rated assemblies (around penetrations like pipes, ducts, cables) to maintain the assembly's fire-resistance rating and prevent fire/smoke spread.
What is "constructability" and why is it considered during design?
The ease and efficiency with which a building can be built. Considering it during design β sequencing, tolerances, standard sizes, access, and buildable details β reduces errors, change orders, cost, and schedule delays.
State the basic detailing principle for keeping water out of a building envelope joint and name a common method.
Use redundancy and gravity: shed water outward and downward and provide a secondary line of defense. Common methods include flashing, drip edges, lapping materials shingle-fashion (over-under), end dams, and back-up sealant/drainage planes.
Architect Registration Examination (ARE) Project Planning and Design FAQ
What is in the Architect Registration Examination (ARE) Project Planning and Design syllabus?
Architect Registration Examination (ARE) Project Planning and Design is split into 4 chapters: Design Concepts and Sustainability, Building Codes and Regulatory Compliance, Building Systems Integration in Design and Materials, Assemblies, and Building Envelope. Together they contain 16 topics and 22 sub-topics.
How many chapters are in Architect Registration Examination (ARE) Project Planning and Design?
4 chapters, containing 16 topics and 22 sub-topics. The largest chapter is Design Concepts and Sustainability, with 4 topics.
Are there flashcards for Architect Registration Examination (ARE) Project Planning and Design?
Yes β a 50-card Project Planning and Design deck, printed in full in the flashcards section of this page and available in the Examius app with spaced repetition. The free plan covers one exam of your choice, including its flashcards; Examius Pro, a one-time purchase, unlocks every other exam and deck.